S.N. |
Description |
Estimated cost(in Crores) |
Start Date |
End Date |
|
Smart Classroom |
|
|
|
|
So far the college has only 2 smart classrooms and therefore only 100 students are able to avail the benefit of smart classrooms. |
4.72 |
|
|
1. |
The 02 existing Smart class rooms need to be upgraded as only 100 students are accommodated in the present scenario. |
|
01/04/2018 |
31/03/2019 |
2. |
To Increase the number of classes further in smart class rooms, 02 new classrooms are to be constructed so that total 200 students can be accommodated. |
|
01/04/2018 |
31/03/2019 |
3. |
Maintenance of the 04 smart classrooms. |
|
01/04/2019 |
31/03/2023 |
|
PARKING |
|
|
|
|
The college has only 01 parking shed so far, catering to only 05 four wheelers We need to cater for parking for 60 four wheelers and 40 two wheelers. |
|
|
|
1. |
Parking sheds for 20 vehicles to be constructed. |
|
01/04/2018 |
31/03/2019 |
2. |
Parking sheds for 40 two wheelers will constructed. |
|
01/04/2018 |
31/03/2019 |
3. |
Parking sheds for 20 vehicles to be constructed. |
|
01/04/2018 |
31/03/2019 |
4. |
Parking sheds for 15 vehicles to be constructed. |
|
01/04/2019 |
31/03/2020 |
5. |
Maintenance of the parking sheds. |
|
01/04/2020 |
31/03/2023 |
|
CCTV Camera |
|
|
|
|
In order to enhance the quality of teaching and learning, strict monitoring of the classes and the campus is essential. |
|
|
|
1. |
CCTV Camera to be installed |
|
01/04/2018 |
31/03/2019 |
2. |
85 Cameras to be installed, once the budget is released. |
|
01/04/2018 |
31/03/2019 |
3. |
Maintenance of the CCTV Cameras. |
|
01/04/2019 |
31/03/2023 |
|
FURNITURE |
|
|
|
1. |
So far the institution has only 50% of the required furniture and almiras. |
|
01/04/2017 |
31/03/2018 |
2. |
25% of the furniture and almiras as required. |
|
01/04/2018 |
31/03/2019 |
3. |
25% of the furniture and almiras as required. |
|
01/04/2019 |
31/03/2020 |
4. |
Maintenance of 100% of the furniture and almirahas. |
|
01/04/2020 |
31/03/2023 |
|
Drinking Water Facility /Washrooms |
|
|
|
|
There is already a facility of drinking water. 3 Water coolers with aqua guard are already installed in the campus. The washrooms needs up-gradation and maintenance. |
|
|
|
1. |
Annual maintenance of aqua guard of all the water coolers. Up-gradation of washrooms. |
|
01/04/2018 |
31/03/2019 |
2. |
03 more water coolers to be installed and 03 washrooms to be up-graded. |
|
01/04/2018 |
31/03/2019 |
3. |
03 more water coolers to be installed. |
|
01/04/2019 |
31/03/2020 |
4. |
Maintenance of drinking water facility and washrooms. |
|
01/04/2020 |
31/03/2023 |
|
Campus Up-gradation |
|
|
|
|
There are many rare plants and medicinal plants available in the campus. Efforts will be made to protect them. Eco Parks will be developed in open spaces in the campus. |
|
|
|
1. |
The open space opposite A-Block will be developed. |
|
01/04/2018 |
31/03/2019 |
2. |
The open space opposite B-Block will be developed. |
|
01/04/2018 |
31/03/2019 |
3. |
The open space opposite AV-Block will be developed. |
|
01/04/2019 |
31/03/2020 |
4. |
Maintenance of all the plants and blocks. |
|
01/04/2020 |
31/03/2023 |
|
Electrification |
|
|
|
|
As the institution runs in a heritage building it requires constant monitoring of electric wiring. |
|
|
|
1. |
Planning and proposal for electrification to be sent, survey to be conducted. |
|
01/04/2018 |
31/03/2019 |
2. |
New electrification of A & B block. |
|
01/04/2018 |
31/03/2019 |
3. |
New electrification of P, G & H block. |
|
01/04/2019 |
31/03/2020 |
4. |
Maintenance of electrification of all the blocks |
|
01/04/2020 |
31/03/2023 |